dam up
英 [dæm ʌp]
美 [dæm ʌp]
壅高;筑坝壅水;挡水
英英释义
verb
- obstruct with, or as if with, a dam
- dam the gorges of the Yangtse River
双语例句
- Therefore, protective measures for preventing tailing dam breach should be taken from the respects of improving the design of flood control ability, strengthening the stability of the dam and tightening up the management.
因此,预防溃坝的环境风险防护措施,要从防洪设计、增强坝体稳定性及加强管理等方面进行。 - On the basis of the technique of system simulation and the theory of queue stochastic simulation network, the queue network simulation model and the construction process simulation model for high roller compacted concret dam have been set up.
本文根据碾压混凝土坝施工特点,采用计算机系统仿真技术和排队随机仿真网格理论,建立了高碾压混凝土坝施工交通运输系统排队网络仿真模型和高碾压坝施工浇筑过程仿真模型。 - Dam foundation and dam construction quality come up to excellent standards and the project is elected the high-quality project.
大坝工程的基础处理及填筑施工质量达到优良水平,被水电部评为优质工程。 - Thus it is very pressing for us integrating digital asset of TV media better, establishing the theory of digital asset management ( DAM), setting up operation modes and evaluation methods, etc..
因而,对于如何更好的整合电视媒体的数字资产,构建基于数字资产管理(DAM,DigitalAssetManagement)的理论、运营模式及评价方法等,便成为当务之急。 - The impermeability of the concrete has been greatly improved and leakage of the dam body is decreased up to 1. 88 m3/ h, thus meeting the design requirement.
堰顶横缝表面封堵和混凝土裂缝的化学灌浆处理,增强了混凝土的防渗性能,坝体渗漏量降为1.88m3/h,满足了设计要求。 - The major contents are as follows: ( 1) According to the conservation of energy theory and the heat transfer theory, the heat transfer model of dam leakage is set up through the combination with the conservation energy equation and the heat transfer equation.
根据能量守恒原理、传热学理论,由能量平衡方程及热传导方程联合建立大坝渗漏传热模型。 - The basic conditions, which the dam system can come up to relative stability, are as follow.
坝系要达到相对稳定,最基本的条件有3个:一是相对稳定系数必须大于或等于一定的允许值,这是坝系要达到相对稳定的关键; - By applying static hydrodynamics law to analyze the rubber dam, a static two-dimensional model of rubber dam without outflow was set up.
通过流体静力学规律对橡胶坝进行分析,建立了无溢流情况下橡胶坝的静态二维模型。 - Stress variation law about masonry multi-arch dam is brought up a and the final stabilization layout to Pingqiao masonry multi-arch dam is decided.
分析各加固方案对砌石连拱坝应力影响的基本规律,并确定适合本工程项目的加固方案; - The analysis of planting trees to the different discharge in same base slopes at the same time mean velocity in section before and after explained vegetation dam can let up average current velocity in front and inside of dam, and turn the current velocity peak value even.
同时通过对相同底坡不同流量下植树前后断面平均流速的分析,说明了植物坝能较好的减小坝前和坝内的水流平均流速,并将流速峰值均匀化。